Thursday, June 4, 2015
Wall-to-Wall Fertilizer Application
Wednesday, June 3, 2015
Deep Tine Aerification Complete
Deep tine aerification has been completed on all the greens using a 12" long tine. This work requires specialized equipment and was contracted to Harmon Turf Services (HTS) of Hillsville, Virginia. HTS has been an IGM Preferred Contractor for almost 15 years.
Deep tine aerification will help with water penetration as well as improve air and gas exchange in the root zone. Air and gas exchange is important to have healthy turf but will also allow the soil fumigant to penetrate as deeply as possible.
Monday, June 1, 2015
Encroachment Collar
![]() |
| Putting surface on the left will be TifEagle. The portion of the collar in the center that has been killed will be the TifGrand encroachment collar. |
An encroachment collar is used around the green to prevent the perimeter grasses from growing into putting surface. Without managing encroachment, over time the greens can shrink in size or loose their definition. We have chosen to use a 32" band of TifGrand Bermudagrass as the encroachment collar. TifGrand has a dense and primarily upright growth habit without as much horizontal growth as some other grasses. It will separate the TifEagle on the green from the 419 that is on the rest of the green surround.
Maintaining clean lines is made difficult during the grow-in process because fertility and thereby growth rates are so high. Throughout grow-in we will be using a mechanical edger to cut a clean line on both sides of the TifGrand collar. As the greens mature and fertility rates are reduced to normal, the vertical edging will continue as a periodic maintenance task.
After a period of years it may be necessary to remove a strip of sod in the encroachment collar and replace it with clean TifGrand to maintain the buffer.
Sunday, May 31, 2015
Test Run Completed
![]() |
that the steps work as we anticipated and give the desired results.
With the course set to close on Monday, next weeks schedule is one of the busiest of the project. In addition to the extensive surface preparation underway by the IGM staff, we will have two separate contractors onsite. Everything must be ready fumigation on June 10th which is our next major milestone.
Sunday, May 17, 2015
Modification to Number Seventeen Complete
![]() |
| Sod removed and rolled. To be reused |
![]() |
| After sod has been re-laid |
![]() |
| Softer contour |
![]() |
| Topdressing applied to smooth the surface |
Friday, May 15, 2015
Addition to Number Eight Complete
| Native soil was excavated creating a "shell" |
TDI performed this work. They have also been the contractor of choice over the past couple of years for the ongoing bunker refurbishment program. They have moved on to #17 and will return later this summer for both the bunker program as well as to sod the collars and areas on #7.
| The shell is then filled with a special sand mix |
| Sod is laid on the sand mix. Topsoil is used on the approach |
![]() |
| The finished product resulted in a gentle grade of about 1.5% |
![]() |
| Sod has tacked down and 1st mowing at 1 week |
Monday, May 11, 2015
Summer Golf Course Tours
For
those who will be on Plantation this summer and would like to learn more about the project or see the progress, IGM's Jeff
Miller will conduct tours on the 3rd Tuesday of each month leaving from the Golf Shop at 9:00am. Tours dates will be June 16th, July 21st, and August 18th.
Thursday, May 7, 2015
Herbicide Applications Begin
| A line has been painted as a guide. Everything inside the line will be sprayed and then fumigated. |
| Herbicide application taking place |
Tuesday, May 5, 2015
Pike Creek Turf Farm Visit
![]() |
| Plenty of great material available |
We visited Pike Creek Turf Farm near Tifton, Georgia to pick up two pallets of TifDwarf sod to be used on numbers eight and seventeen. While we were there we also checked out the current condition of the TifEagle sprigs that will soon be cut and sent to Bray Island. The field had great color for the season and the turf was dense and healthy. Pike Creek is a first rate operation with terrific quality control. We look forward to working with them.
![]() |
| Two pallets cut and ready for the trip to Brays Island |
Thursday, April 30, 2015
Material Storage Bins
| New material bins will house topdressing sand, bunker sand & topsoil |
With the increased use of topdressing sand needed for
maintenance of TifEagle putting greens, it was necessary to improve the sand
storage at the maintenance facility. Sand needs to be kept dry and free from
contaminants including silt and weed seeds. The new storage bins were built
under the supervision of David Fontenot. They turned out great and came in under
budget.
Subscribe to: